Projects / DRP with RTO/RPO
Project · Business continuity for a SaaS ERP

DRP with RTO/RPO

Oracle NetSuite ERP with 99.7% business availability — maintenance included — and 9 business units in Mexico that keep operating even when the ERP is unavailable.

0.0%
business service availability
≤ 26 h 17 min / year
North
BU-01
BU-02
BU-03
Extreme heat, power outages, coastal hurricanes
Central
BU-04
BU-05
BU-06
Earthquakes and cellular network congestion
South
BU-07
BU-08
BU-09
Hurricanes, floods, fewer carriers available

All 9 BUs run on GMT-6. Three regions reduce the chance that a single event hits them all.

99.7%
business availability
≤ 15 min
to degraded mode at every BU
≤ 1 h
RTO for what the company controls
0
transactions lost (RPO 0)
0 h
of autonomous operation per BU
0 mo
program Dec 2026 → Aug 2027
01The project in 60 seconds

Oracle recovers NetSuite. This plan secures everything else.

Oracle’s SLA (99.7% monthly) excludes scheduled maintenance, which can run around 15 h per quarter. If it counted against our 99.7%, it would use up the annual margin. That is why the target is measured as business service availability: NetSuite windows are covered by the BUs’ degraded mode.

IDEA 1

NetSuite is not failed over

Core DR belongs to Oracle by contract. The company enforces and verifies the SLA, and claims credit when it is missed.

IDEA 2

The BUs never stop

72 h local store-and-forward and their own folios: they sell, receive and invoice even when NetSuite does not respond.

IDEA 3

Zero lost messages

Active-active iPaaS in two regions, persistent queues, idempotent consumers and a DLQ reviewed daily.

IDEA 4

An own data copy

Incremental extraction ≤ 1 h and a daily immutable copy: lookups during an outage, ransomware defense and vendor exit.

RTO

Recovery Time Objective. Maximum time to restore the service.

RPO

Recovery Point Objective. Maximum data that can be lost.

MTPD

Max. Tolerable Period of Disruption. The point at which impact becomes unacceptable.

02SMART objectives and scope

Six measurable goals. "100% continuity" with an operational definition.

Zero transactions lost in integrations, and every BU able to run on its own for up to 72 h even when NetSuite is unavailable.

In scope (the company)

  • NetSuite integration via iPaaS (SuiteTalk, RESTlets)
  • IdP/SSO identity, DNS, WAN/SD-WAN for 9 BUs
  • Own copy of NetSuite data
  • CFDI 4.0 e-invoicing with PAC and host-to-host banking
  • Satellite applications and Oracle SLA management

Oracle’s responsibility

  • Infrastructure and database
  • NetSuite application
  • DR between data centers
  • 99.7% monthly SLA, excluding scheduled maintenance

Out of scope (corporate BCP)

  • Physical facilities continuity
  • Physical security
  • Human resources
  • Interface defined in the activation process
03Governance and RACI

Without business owners signing the BIA, RTO/RPO are just IT numbers.

Sponsored by the CEO office and led by the CIO; each BU contributes a continuity lead with authority to run in degraded mode.

Continuity Committee

Monthly

CEO or CFO (sponsor), CIO (chair), COO, CISO, Legal/Compliance, Finance.

Crisis Management Team

Activated during an incident

CIO as Incident Commander, CISO, Infrastructure, ERP lead, Communications.

Recovery teams

Technical

Cloud, database, ERP, Integrations, Network and telecom, Identity and security, Service desk.

BU-01 to BU-09 leads

Local operation

Run manual procedures and degraded mode at their site.

RACI matrix · tap a role to see its responsibilities
R ResponsibleA AccountableC ConsultedI Informed
04Business impact analysis (BIA)

Each process is ranked by the cost of stopping for 1, 4, 24 and 72 h.

The resulting tier sets its RTO/RPO. The BIA is gathered through interviews at the 9 BUs and signed by each process owner. Tap a tier to filter the inventory.

05RTO / RPO / MTPD matrix

What we own recovers in ≤ 1 h. Integrations, with RPO 0.

Each row is a component. Left of the disaster: how much data can be lost (RPO); right: how long it takes to come back (RTO) and how long the business can hold out (MTPD). Log scale.

RPORTOMTPDDisaster

* Oracle sets the RTO for the NetSuite core; when it goes down the strategy is not to fail over but to keep the BUs running in degraded mode. Before Phase 2 the contract must confirm the RTO/RPO of Oracle’s DR (if it is not set, that is risk R08).

"100% continuity" in integrations means:

🔒
Zero loss

Every message is acknowledged only after it is persisted in a replicated queue.

🧬
Zero effective duplicates

Idempotent consumers with a unique transaction key.

📦
Local autonomy

Each BU stores 72 h and resends in order when the link returns.

🧭
Traceability

End-to-end correlation ID; DLQ with alerts and daily review.

⚖️
Reconciliation

Source vs. ERP counts and amounts per BU after every event.

06Availability budget

With Oracle’s SLA as the only backstop, 99.7% is not met.

Network, identity and iPaaS sit in series with NetSuite; degraded mode acts in parallel and covers a fraction c of its downtime. Move the sliders to check it.

Composite availability calculator
99.82%
≈ 15.8 h of downtime per year
Meets 99.7%
Anegocio = Ared × AIdP × AiPaaS × [ ANetSuite + (1 − ANetSuite) × c ]

Oracle reports a historical 99.96%, but the plan is designed against the contractual SLA, not the track record.

Annual budget allocation: 26.3 h
26.3 hper year
Hover or tap a segment to see its control rule.
Error budget policy
0%50%75%100%
26 h 17 minYear (8,760 h)
6 h 34 minQuarter
2 h 11 minMonth (730 h)
30 minWeek
07Target architecture · simulator

If NetSuite goes down, all 9 BUs keep operating.

BUs write to NetSuite through the iPaaS; if NetSuite does not respond, transactions wait in queues and local store-and-forward, and are applied in order when service returns. Pick a scenario.

00:00time in contingency (simulated)
0transactions queued (illustrative)
0transactions lost
Integrations
Active-active iPaaS in two regions, persistent queues, idempotency, DLQ, NetSuite concurrency control.
Guarantees zero lost messages.
Business units
Local store-and-forward agent with 72 h capacity and own folios.
They keep selling, receiving and invoicing.
CFDI e-invoicing
Stamping from the BU with dual PAC when NetSuite is unavailable.
Legal deadlines don’t wait for the ERP.
Identity
Multi-region IdP; NetSuite emergency accounts with MFA in a vault.
If SSO fails, you can still get into NetSuite.
Network
DNS with health checks; dual-carrier SD-WAN + LTE/5G or satellite (south).
Failover in minutes, hands-off.
Own data copy
Incremental extraction via SuiteAnalytics Connect or API; daily immutable full copy.
Lookups, ransomware defense and vendor exit.
Observability
Synthetic monitoring from each BU to NetSuite and iPaaS; error budget dashboard.
Measures what users experience and backs SLA claims.
NetSuite
Oracle DR by contract; subscribed to the status page and maintenance notices.
Not failed over; the SLA is enforced and verified.
Integration platform: reference example

Boomi lets the runtime be deployed in the company’s cloud across two regions — what RTO 1 h and RPO 0 messages require. Confirmed or replaced in Phase 2.

CriterionBoomi (reference)Celigo integrator.io (alternative)
DeploymentOwn runtime cluster on AWS, Azure or GCP, or Boomi cloudSaaS managed by Celigo
High availabilityMulti-node cluster; can be replicated across two regionsCeligo’s responsibility, under its SLA
Control over RTO/RPOHigh: the company decides regions, queues and failoverMedium: depends on the vendor
Best fitMany custom integrations and RPO 0 requiredStandard integrations and a small team

Oracle has announced the end of SOAP in NetSuite 2028.2: every new integration is built on REST. Local store-and-forward is mandatory with any platform.

08Disaster scenarios

Eight scenarios. Ransomware is the worst: it also contaminates the replica.

That is why it demands immutable backups and a clean recovery environment. Tap a scenario in the probability × impact matrix.

Probability →
NetSuite is not failed over

On E1, degraded mode is activated, a sev. 1 case is opened with Oracle and times are logged for the SLA claim.

Restore vs. fail over

If the damage is logical (E2, E3), failing over the iPaaS replicates the problem: fix it from a clean point.

Degraded mode first

In any scenario, BUs switch on store-and-forward at minute 0 to protect data while decisions are made.

09Activation, escalation and return

No BU stops for more than 15 min, even if NetSuite takes hours.

Only the CIO (or a designated deputy) declares a major contingency; the on-call lead activates degraded mode without waiting for that declaration. Play the timeline.

T+0NetSuite or Tier 0 component outage

Escalation matrix

N1
15 min
Alert or degradation

IT on-call, service desk

N2
30 min
Confirmed Tier 0/1 outage

Technical leads, ERP lead

N3
30 min
Risk of exceeding RTO or cyberattack

CIO, CISO, Crisis Team

N4
1 h
Declared disaster or customer/regulator impact

Sponsor, CEO office, Legal, Communications

Return to normal operation

⚖️Degraded mode is switched off only when queues are drained and the BU’s reconciliation shows zero differences.
🗓️Moving the iPaaS back to region A is scheduled in a planned window with CAB approval.
🧾CFDI issued during contingency are recorded with their original UUID; they are never re-stamped.

10 runbooks

10Testing and exercise plan

The test that validates the plan: disconnecting NetSuite for all 9 BUs.

NetSuite cannot be failed over, so what gets tested is the continuity around it. The program scales from tabletop exercises to the full test once a year.

The cycle of every test

Plan approved by the CAB with scope, window and rollback criteria.
Execution with a timekeeper and a time log per step.
Report within 5 business days: actual vs. target RTO/RPO, findings and owners.
Runbook updates and follow-up in the Continuity Committee.
11Crisis communication

If the IdP goes down, so does email. Channels don’t depend on the ERP.

One spokesperson per audience and updates at committed times. Printed directory, also kept in an offline vault, reviewed every quarter.

12Roadmap

9 months. Certified in July 2027 with a full NetSuite disconnection.

7 phases and 4 gates; no phase moves on until its gate is approved. F3 and F4 overlap by four weeks so runbooks are written on the real infrastructure. Tap a phase.

13Master checklist

A phase closes only when every item is checked.

Check items to see progress per phase. Includes the operational checklist for use during an incident.

14Risk register

The biggest risk isn’t technical: the business not validating RTO/RPO.

Or the plan going stale after year one. Eleven risks, each with an owner and a mitigation.

Probability →
15KPIs and compliance

Eight indicators a month. Two matter to the business.

End-to-end availability and lost transactions, which must be 0.

ISO 22301

BIA, continuity strategy, plans, exercises and management review.

ISO/IEC 27001:2022

A.5.29 security during disruption · A.5.30 ICT readiness for continuity · A.8.13 backup · A.8.14 redundancy.

NIST SP 800-34

Methodological reference for BIA and IT contingency plans.

16Glossary

Every acronym, in one line.

Continuity that is designed, tested and measured.

A project by Fernando Gómez Guerrero · LATAM Regional IT Leader.